Wind System Under Construction in Michigan

Briefly Noted

2002-02-14 [SolarAccess.com] A six, wind turbine generating system is under construction in Benona Township, Michigan that is expected to gross 15,600 kW annually when the facility comes online in December.
Previous articleAstroPower Adds to Staff
Next articleTraditional Energy Costs Drop in Houston Texas

No posts to display