EI Solutions To Build Solar Installation for Sony Pictures Entertainment

[RenewableEnergyAccess.com]  EI Solutions, the systems integration arm of Energy Innovations, Inc., and Sony Pictures Entertainment  today announced that the companies will be constructing a pilot solar electricity system at the studio’s Culver City, California company headquarters.  The planned 235kW installation will be part of an expansion project underway at the historic studio lot in Culver City.  The design phase of the solar system has commenced and installation is scheduled to begin in October 2007 and will be completed in early 2008.  The solar panels will be located on the rooftop of the Jimmy Stewart Building and the solar energy generated from the installation will be used to offset electricity needs at the Culver City office facilities.

Previous articleHungary’s Pannonplast To Build Geothermal Plants
Next articleUp Close & Renewable: Solar Homes on Display

No posts to display