Contract Awarded for half-MW solar PV Project

[RenewableEnergyAccess.com] California-based EI Solutions said they were recently awarded a contract by Las Gallinas Valley Sanitary District to engineer, supply, and construct a 594kW solar photovoltaic power system. Covering nearly two acres of District property, the system will feature the largest ground-mounted solar array in the San Francisco Bay Area and will provide enough clean solar power to supply over 88% of the District’s future energy needs. EI Solutions worked closely with Sharp Solar to develop the winning design proposal. The system features 2,898 Sharp ND-205U1 205 Watt photovoltaic modules. This is not the District’s first foray into solar power. Last year, the District installed a smaller 88 kW system, also provided by EI Solutions, to power a remote water reclamation pump. In large part, it was the District’s careful monitoring of the smaller system’s performance that supported a decision to proceed with the second project.
Previous articleNew Zealand Co. Calls for Support on Wind Farm
Next articleUSDA Identifies First Crop of Bio-based Products

No posts to display