ElectraNet’s ESCRI-SA* grid-connected 30 MW / 8 MWh battery energy storage solution (BESS) has drastically reduced outages—from 8 hours down to 30 minutes—within its first six months of operation, improving network stability, minimizing renewable curtailment and maximizing reliability.
Join ABB’s industry experts John Glassmire and Stanislav Cherevatskiy for an online discussion on BESS. The webinar will focus on high-value services such as virtual synchronous generator, black start and virtual inertia, among others. Learn to replicate the ESCRI success story in your network!
If you want to find out more about the ESCRI project in preparation for the webinar, please visit: https://www.escri-sa.com.au/about/
Registration Bonus – Register and receive the following documents:
1. ESCRI Case
2. Addressing Radial Feeder Challenges with Microgrid Value Stacking
3. Infographic: Revolutionizing the way energy is managed and consumed
*Energy Storage for Commercial Renewable Integration, South Australia
Presented By:
Sponsored By: ABB Power Grids

ABB’s Grid Edge Solutions are leading energy innovation and transition, from islands and remote communities seeking energy autonomy, to commercial and industrial sites aiming to unlock new economic opportunities, as well as utilities and service providers striving to effectively manage their increased portfolio of renewables and distributed energy resources.
Our e-mesh™ portfolio includes energy storage and digital automation solutions for energy optimization and management, advanced control, and monitoring. Our global footprint covers more than 500 MW and 200 references. ABB helps customers increase profitability and unlock new revenue streams by reducing energy cost, maximizing renewable integration and lowering C02, while improving overall reliability.
Visit us at: https://new.abb.com/distributed-energy-microgrids/our-offering/e-mesh