The Bureau of Reclamation has issued another solicitation to supply flow meter systems to three Reclamation irrigation and flood control dams in Utah. Bids are due April 26.
Reclamation seeks manufacture, installation, and commissioning of four-path ultrasonic flow meter systems for Pineview Dam on the Ogden River; Stateline Dam on East Fork, Smiths Fork River; and Hyrum Dam on the Little Bear River.
The agency previously took bids in December for flow meter systems at Stateline, Hyrum, and Moon Lake Dam on Lake Fork.
A solicitation notice may be obtained from the Federal Business Opportunities Internet site, www.fbo.gov, by entering solicitation No. R13PS49040 in the “Keyword/Solicitation #” box. Specifications and drawings may be obtained by phone or e-mail request to the address below.
Bids are due April 26. For information, contact Lisa Hilton, Contracting Officer, Bureau of Reclamation – UC – Provo, 302 E. 1860 South, Provo, UT 84606; (1) 801-379-1117; E-mail: [email protected].