Uncategorized

Image Gallery

01 / 01

The Avian Factor: 195 Turbines, 125 Fatalities

In addition to the post-construction studies, Maple Ridge conducted a summer bat study, a fall migration radar and night vision study, Phase I Avian Risk Assessment, and a Breeding Bird Survey before the project was approved for construction.