India’s Patrind hydel plant awarded U.N. Clean Development Mechanism status

Pakistan’s 147-MW Patrind hydroelectric project has earned status as a clean development mechanism (CDM) under the United Nations Framework Convention on Climate Change, HydroWorld.com has learned.

The Patrind hydel project is located on Pakistan’s Kunhar River and is being developed by a consortium called Star Hydro Power Limited (SHPL), which is comprised of the Korea Water Resources Corporation (K-water) and the Daewoo Engineering & Construction Company.

The group is reported to have filed its application for CDM registration in June 2012, saying the Patrind plant will reduce carbon dioxide output by about 270,000 tons per year.

For more news from India, visit here.

a man standing next to a monitor

Sense smart meter software gives utilities a real-time look at the grid edge

Sense software embedded in smart meters can help utilities get a better look at the grid edge, as CEO Mike Phillips explains at DTECH.
a G&W Electric Viper-ST recloser

G&W Electric shows off next-gen recloser amongst transmission and distribution solutions at DTECH

G&W Electric is presenting a variety of transmission and distribution solutions at DTECH, including its next-generation Viper-ST recloser.