Colombia utility seeks water quality modeling for 2,400-MW Ituango hydroelectric project

Colombia utility Empresas Publicas de Medellin (EPM) invites expressions of interest from consultants to develop water quality models for the proposed reservoir and downstream of the 2,400-MW Ituango hydroelectric project in Colombia. Questions may be submitted until April 4, with responses due April 11.

EPM last year recruited a financial consultant for Ituango. Alstom received a contract in 2012 to supply eight 300-MW Francis turbines, along with speed regulators, cylindrical gates, generators and excitation systems. Preliminary work for project construction began in 2011.

The utility now seeks expressions of interest from consultants to implement one or more mathematical models to predict different scenarios of water quality in the future reservoir and downstream in the Cauca River. Models are to consider sediment, macrophytes, debris, stratification, and possible emission of greenhouse gases. The work is expected to require 365 days.

Questions may be submitted by e-mail to Juan Morales at [email protected] until 5 p.m. April 4. Expressions of interest are due by hard copy in Spanish to the address below by 3 p.m. April 11.

For information, contact Empresas Publicas de Medellin E.S.P., Jorge Emilio Mesa Arroyave, Director Ambiental, Social y Sostenibilidad Proyecto Ituango, Carrera 58, No. 42-125 Torre Sur Piso 9, Oficina 09-380, Medellin, Colombia; (57) 4-3802080; E-mail: [email protected]; Internet: www.epm.com.co.

Here’s how Siemens Energy is thinking about cybersecurity for the grid

Siemens Energy is working to support an asset-agnostic environment that protects the electric grid from modern cybersecurity threats.
a man standing next to a monitor

Sense smart meter software gives utilities a real-time look at the grid edge

Sense software embedded in smart meters can help utilities get a better look at the grid edge, as CEO Mike Phillips explains at DTECH.