Bolivia utility Empresa Electrica Valle Hermoso (EVH) seeks bids to perform final design and to draft bidding documents for construction of the 5-MW Huacata hydroelectric project in Bolivia’s Tarija Department. A bidders meeting is set August 31, with bids due September 11.
Other hydro projects under way in Bolivia include 120-MW Misicuni, 1,600-MW El Bala and 200-MW Miguillas.
EVH seeks bids to perform a study of final design and to develop bidding documents to construct, equip, install and commission the Huacata project. The work is expected to require 300 days at a cost of 3.4 million bolivianos (US$494,460).
A solicitation notice may be obtained from the EVH Internet site under http://www.evh.bo/index.php/publicaciones/convigentes/122015. Tender documents may be obtained under http://www.evh.bo/evh/publicaciones/122015/1521024-IN-TR-001.rar.
A bidders meeting is set for August 31, with questions due by September 7.
Bids are due by 3 p.m. September 11. For information, contact Jose Maria Eterovic, Asistente de Proyectos, Gerencia Comercial y Proyectos, Empresa Electrica Valle Hermoso (EVH), Cochabamba, Bolivia; (591) 4-4240544; Fax: (591) 4-4115195; E-mail: [email protected]; E-mail: www.evh.bo.