On-Site Visits by a Field Technician Are Included With Every Solar FlexRack Purchase
June 24, 2011
Expert installation guidance available to meet each project's unique needs
YOUNGSTOWN, OHIO — It's a given that no photovoltaic rack mounting hardware can be installed more quickly, easily and with fewer workers than the Solar FlexRack.
"The Solar FlexRack is easy to install, but I show the guys in the field all the proper techniques that will make the process as efficient as possible."
While other rack mounting systems require a six-man crew and 30 minutes or more to erect, a Solar FlexRack can be erected by a three-man crew in less than three minutes. The result: significant savings in labor costs and cost-per-watt (as much as 40 percent) for any solar project. It’s the nature of the product itself that makes this quick installation time possible. But the overall success of any project in which the Solar FlexRack is used is further assured by optimum preparation of the site, as well as expert training of the installers. That’s where Tim Frantz, Solar FlexRack’s Field Technician, comes in. A site visit by Frantz at the beginning of any project using the Solar FlexRack is included at no charge with the purchase, and he routinely returns as the project progresses to ensure all is going smoothly. “I like staying ‘in the loop’ on all the projects we have going,” Frantz says. “The Solar FlexRack is easy to install,” he continues, “but I show the guys in the field all the proper techniques that will make the process as efficient as possible. Getting all the racks parallel and square is the most important thing, along with making sure the transition from rack to rack is done properly.”
Additional Information
The information on this page was created and posted by the company identified above. RenewableEnergyWorld.com does not endorse, edit, or substantiate this information and assumes no obligation for this content's accuracy. |
Solar FlexRack
Recent Press Release |

Feed
Share