An 18-MW biomass plant is set to reopen in Imperial, California as part of the ML Energy Park after a 2010 earthquake damaged the facility. Viaspace signed a contract with Mesquite Lake Water and Power LLC to supply the plant with its Giant King Grass (GKG) feedstock, which will be mixed with wood waste.