The U.S. geothermal industry recently scored a big win when its first enhanced geothermal system (EGS) project went online in April. ORMAT was able to stimulate a previously unproductive well at its Desert Peak project with EGS technology — injecting fluid into a well to reopen cracks and create a resource reservoir — and found an additional 1.2 megawatts (MW) of capacity. Renewable energy experts applauded the project, dubbing it a "game-changer" and a "shining moment" for the industry.

This article can be found in our completely redesigned Renewable Energy World digital magazine. Subscribe here to recieve a free copy.