The World's #1 Renewable Energy Network for News, Information, and Companies.

Panasonic Agrees to Help Tesla Build Battery ‘Gigafactory’

Panasonic Agrees to Help Tesla Build Battery ‘Gigafactory’

Panasonic Corp. agreed to help set up the battery factory that Tesla Motors Inc. Chairman Elon Musk needs to sell more electric cars, without settling its share of the investment costs.

Panasonic will build cylindrical lithium-ion cells and provide equipment, machinery and other tools for Musk’s “Gigafactory,” the Osaka, Japan-based company said today in a joint statement with Tesla. The companies said they were still discussing the details, including Panasonic’s financial contribution to the facility, which Tesla has estimated could cost as much as $5 billion by 2020.

“We will reach a plan that is profitable,” Panasonic Chief Financial Officer Hideaki Kawai said at a news conference in Tokyo. “We will do step-by-step investment to meet the gradually growing needs.”

Tesla has courted Panasonic to invest in the factory Musk is counting on to produce cheaper batteries and help transform the company from a seller of $71,000 Model S sedans into a mass- market carmaker capable of producing 500,000 vehicles a year. Panasonic, which owns 1.1 percent of Tesla, signed a preliminary agreement to participate in the project in May after voicing hesitancy about the level of investment risk.

Separately, Panasonic reported profit of 37.9 billion yen ($368 million) for the three months ended June, missing analysts’ estimates. Its shares rose 0.6 percent to 1,257.50 yen in Tokyo today. Tesla gained 1.7 percent to $228.92 yesterday in New York and has surged 52 percent this year.

‘Significant Risk’

Panasonic is cementing its participation in the project after Tesla raised about $2.3 billion in March to help fund it. Musk faces skeptics in his effort to build a factory with enough scale to cut battery costs by about 30 percent. Standard & Poor’s slapped Tesla with a junk credit rating in May and cited “significant risk” in its Gigafactory plans.

“If Tesla’s EVs do not sell in line with Tesla’s expectations, Panasonic may not be able to recoup its investment,” Masahiro Wakasugi, a Tokyo-based analyst at BNP Paribas, wrote in a July 10 report. “The negative impact, if the plan is not a success, would be considerable.”

Cheaper batteries will be crucial for Tesla to introduce more affordable models beginning with the Model 3 sedan due by 2017. Tesla plans to sell the car at a base price of about half the U.S. cost of its flagship Model S.

Power Storage

Musk, who also runs rocket maker Space Exploration Technologies Corp. and SolarCity Corp., plans to build stationary batteries to store power at homes and buildings with solar panels from the plant.

“Not only does the Gigafactory enable capacity needed for the Model 3 but it sets the path for a dramatic reduction in the cost of energy storage across a broad range of applications,” JB Straubel, Tesla co-founder and chief technical officer, said in the statement.

Tesla is studying potential sites for the Gigafactory in Arizona, California, Nevada, New Mexico and Texas and may initially select three for preparation work. The company will choose which site to build to completion late this year, Musk said during an annual shareholder meeting in June.

Simon Sproule, a Tesla spokesman, declined to discuss whether the carmaker will name the initial factory sites today when it releases second quarter results.

Copyright 2014 Bloomberg.

Lead image: Battery Illustration via Shutterstock.

RELATED ARTICLES

Students and solar powered cars with energy storage

Rain or Shine, Students Keep Their Solar Race Cars Going with Energy Storage

Wayne Hicks, NREL Teegan and Kira Cordova love the original Star Trek TV series. That much is obvious. The eighth-grade twins from Ken Caryl Middle School in Littleton are wearing the uniform tunics from the 1960s show — Teegan's in red and...
MIT Clean Energy Prize

MIT Clean Energy Prize Awards $400,000 to Energy Efficiency, Renewable Ventures

Eric Kirchblum, MIT Earlier this month, the MIT Clean Energy Prize (CEP) announced the winners of the 2015 competition at the Eversource MIT Clean Energy Prize Showcase & Grand Prize Awards Ceremony, where it awarded over $400,000, includ...

The Big Question: What Is the Most Frustrating Part about Working in Renewable Energy?

Renewable Energy World Editors

Every industry has its challenges and misunderstandings. Sometimes the obstacles we face in simply trying to do our jobs can be very frustrating.

ViZn Flow Batteries

ViZn Turns to Jabil to Meet Growing Demand for Flow Batteries

Andrew Burger, Correspondent Energy storage startup ViZn, developer of advanced zinc-iron flow battery technology, is scaling up the size and scope of its operations as it works to meet growing demand from a variety of customers both in the U.S. and a...

CURRENT MAGAZINE ISSUE

Volume 18, Issue 3
1505REW_C11

STAY CONNECTED

To register for our free
e-Newsletters, subscribe today:

FEATURED PARTNERS



EVENTS

PV-201: Introduction to PV Design & Installation

PV 201 Introduction to PV Design & Installation is simply the best i...

PV-301: Advanced PV Design & Installation

This highly desirable and advanced course is intended for the profession...

PV-401: Advanced Field Training

Real world on the job solar installation, training, and experience is th...

COMPANY BLOGS

Community Solar Solutions Appeal to Eco-Conscious Millennials

Tech savvy and convenience oriented, the millennial generation is the mo...

Building Rapport

How do you build rapport with your prospect? This is a question that I a...

Up to Bat – Why More Solar Companies Are Thinking Seriously About A...

Given the growth of the solar industry in the U.S., with 2014 year-...

SOCIAL ACTIVITY

Tweet the Editors! @megcichon @jennrunyon

NEWSLETTERS

Renewable Energy: Subscribe Now

Solar Energy: Subscribe Now

Wind Energy: Subscribe Now

Geothermal Energy: Subscribe Now

Bioenergy: Subscribe Now  

 

FEATURED PARTNERS