The World's #1 Renewable Energy Network for News, Information, and Companies.
Untitled Document

GE's New "Brilliant" Wind Turbine Put to the Test

Earlier this year GE launched its new 2.5-120 wind turbine targeting low-wind-speed sites (7.5 m/s average wind speed, for IEC Class III and DiBT WZ2 environments), offering what it says will be better efficiency (25 percent) and power output (15 percent) than its current model, the 2.85-103.

The new system is now installed at a test site in Wieringermeer, The Netherlands (about 50 km north of Amsterdam), where it will be tested and validated through this fall.

GE touts its new turbine's pedigree as not just intelligent or smart, but downright "brilliant" due to its utilization of the "Industrial Internet" to help manage the intermittency of wind-produced energy, explained Keith Longtin, GM of wind products at GE, in an interview when the turbine was first announced. The system analyzes tens of thousands of data points per second with sensors on the turbines tracking everything from wind speed and direction to blade pitch, communicating with other turbines to share and compare performance data and more intelligently support voltage. "If the turbine knows what's going on with other turbines, it may not have to shut down," he explained. That also could expand to wind farms communicating with each other, across grids and county lines with different regulations.

That communication should also save time and money on the servicing side. If a turbine does indeed require maintenance, data about the problem is sent to the service technician who can figure out what parts to bring to specifically address a problem -- or whether an on-site fix is required at all.

The turbine integrates a small amount of energy storage (100-350kW) and "some forecasting algorithms" to predict power output in 15-30 minute stages. That's not overnight arbitrage on a megawatt-scale, but it does serve to "strengthen the grid for a short period of time," Longtin explained.

It's the "next chapter of where we're taking the business," he said.

The 2.5-120 is also taller than other turbines at 139 meters, with 120-meter rotors and 58.7-meter blades. Capacity factor exceeds 45 percent, which in a ~7 meters/second environment translates to more than 10 GWh/year, according to Longtin. (Power generation starts at 3 m/s, he noted.)

Untitled Document

Get All the Renewable Energy World News Delivered to Your Inbox - FREE!

Subscribe to Renewable Energy World Magazine and our award-winning e-Newsletter to stay up to date on current news and industry trends.

 Subscribe Now


US Senate Democrats Unveil Energy Bill That Restores PTC and Extends ITC

Brian Eckhouse, Bloomberg Senate Democrats unveiled a bill that would provide more tax credits for renewable energy while killing some tax ince...

Sage Grouse Removed as Threat to Biggest Wind Farm in U.S.

Christopher Martin, Bloomberg Billionaire Phil Anschutz’s plans to build a $5 billion wind farm in southeast Wyoming will no longer be stymied by t...

CEO Gilles: Challenge in Geothermal is to 'Level Playing Field' with Wind, Solar

Jennifer Delony The current challenge for the geothermal energy industry is what U.S. Geothermal CEO Dennis Gilles calls “leveling th...

NRG Energy to Form Renewable Unit, Sell Wind Assets to Yieldco

Mark Chediak and Matthew Monks, Bloomberg NRG Energy Inc., the worst-performing member of the S&P 500 Utilities Index this year, said it will form a renewa...


US Solar Institute Chosen for Military Solar Training at Patrick Air Force Base

In August 2015, the Air Force chose The US Solar Institute (USSI) for a specialized sol...

Canadian Solar Signs Agreement with Mashiki Town and Kumamoto Prefecture to Build 47 MW Solar Plant in Japan

Canadian Solar Signs Agreement for 47 MW Solar Plant

NC State University Installs Student-Funded Spotlight Solar Structure to Drive Awareness and Adoption of Clean Energy

North Carolina State University (NC State) will today showcase its commitment to clean ...

NEC Energy Partners with Eos Energy Storage to Bring Revolutionary Energy Storage Product to Market

NEC Energy Solutions (“NEC ES”), a subsidiary of NEC Corporation, announced today that ...



Geothermal Visual: GEA, Clean Energy Organizations Tell Congress: We Need Tax Extenders 'As Soon As Possible'

In a letter dated Oct. 5, over 580 signatories representing clean energy industries, including Geothermal Energy Asso...

Beyond Utility 2.0: Part 4 “Next Steps”

Principles, Structure, and Policies of Energy Democracy Energy democracy can best be described as an electricity sy...

Weather watching

GCube, the renewable energy sector insurance underwriter, has launched a new Weather Risk Transfer mechanism to provi...


Jim is Contributing Editor for, covering the solar and wind beats. He previously was associate editor for Solid State Technology and Photovoltaics World, and has covered semiconductor manufacturing and related industries, ...


Volume 18, Issue 4


To register for our free
e-Newsletters, subscribe today:


Tweet the Editors! @jennrunyon



Doing Business in Europe – in partnership with GWEC, the Global Win...

There is now 128.8 GW of installed wind energy capacity in the EU (appro...

JuiceBox Energy Certified Installer Class

JuiceBox Energy is rapidly building out its national certified installer...

Wind Operator Congress Europe

The UK’s only business-focused O&M event for the European wind...


Clean Energy Patents Maintain High Levels in First Quarter, Solar L...

U.S. patents for Clean Energy technologies from the first quarter of 201...

Koch Professor drops his Koch title, still makes same errors plus s...

The Koch Professor’s title isn’t the only thing that’s...

Fact Check: AWEA represents American wind power

The American Wind Energy Association (AWEA) is proud of its members for ...


Renewable Energy: Subscribe Now

Solar Energy: Subscribe Now

Wind Energy: Subscribe Now

Geothermal Energy: Subscribe Now

Bioenergy: Subscribe Now